CERN Accelerating science

  • Sign in
  • Directory

Home

BE-OP-SPS Operations

Think like a proton always positive since 1976

Home

Main menu

  • Home
  • eLogbook
  • SPS Crew
  • SPS Facilities
  • Safety
  • Usefull links
Menu
  • Home
  • eLogbook
  • SPS Crew
  • SPS Facilities
  • Safety
  • Usefull links

Current Status of the SPS

  • Read more about Current Status of the SPS
Subscribe to BE-OP-SPS Operations RSS

Quick links...

SPS Web Piquet
CCC Calls Log
Elogbook
Elogbook (from outside)
Shift Planning
Schedule
Start up Calendar
SPS Statistics
SPS Beam Permit
Old SPS OP Site

SPS Sidebar

CERN SSO Login

Mandate

The SPS section is responsible for the operation of SPS (Super Proton Synchrotron), LEIR, HiRadMat, AWAKE and North Experimental Area.

  • SPS Circumference : 6.9 km
  • 2.5 km of secondary beam lines.
  • protons and ions for fixed target physics at 400 GeV/c
  • protons for HiRadMat experiment at 440GeV/c
  • protons for LHC at 450GeV/c
  • protons for AWAKE at 400GeV/c
  • machine studies for SPS
  • machine studies for LHC
  • Injector for the LHC

OP SPS Indico


SPS
SPS meeting
02/28/2017 - 09:00

2018
Section meeting #2 - crab cavities, AC coating
02/06/2018 - 10:30 - CERN - 874-R-018

2018
Section meeting #3 - LIU BCWG, beam commissioning, HWC status
02/22/2018 - 10:00 - CERN - 774-1-079

2018
Coordination meeting - HiRadMat1
04/30/2018 - 11:30 - CERN - 874-R-018

Slideshow

Contact us

Operator
Coordinator
CERN